The project of developing the Krasnokamensky Rudnik JSC

9 1 2 oblozhka

The main goal of this job was to determine the basic plan of measurements, based on the economic feasibility of the mine and reconstruction of the factory in conditions of limited funding and social responsibility to employees and the population of the village of Krasnokamensk, for which the Krasnokamensky Rudnik JSC is the city-forming enterprise.

Within the framework of the completed job:

  1. An analysis of the financial-economic activity of the Krasnokamensky Rudnik JSC was performed.
  2. An economic model and a business plan for development of Krasnokamensky Rudnik JSC were developed.
  3. A schedule for the completion of the Odinochnaya mine reconstruction and technical re-equipping of the crushing and washing dressing plant (CWDP) of the Krasnokamensky Rudnik. The schedule was developed with the help from specialists from the Institute of Mining, Geology and Geo-technology FSEI HPE “Siberian Federal University”.

1 / 1
White logo arko 8730bf3718ac010699fd3b687d00f7535270650e3f9d04cfe455933bac42fdf5